1/7
Fall Upgrade SaleDealsGarvee 450 LBS Capacity Low Profile Transmission Jack with 2M Safety Straps, 7-23 in Lift Range, Heavy Duty Auto Repair Lifting Jack, Red, Compact Vehicles
$12299
What We Offer
Accident and warranty protection by Xcotton (partner with AIG)
No import charges for all seller-shipped items and no extra charges upon delivery
Key Features
- Heavy-Duty Steel Construction: Robust steel build supports up to 450 lbs—perfect for demanding repairs and maintenance.
- Versatile Lift Range: 7"–23" lift easily handles compact cars and large trucks for maximum flexibility.
- Enhanced Safety & Stability: Wide base and durable nylon safety strap keep your load secure and stable.
- Easy Maneuverability: Four swivel wheels let you position and move the jack smoothly under any vehicle.
- Multi-Functional Tool: Ideal for transmissions, exhaust work, and more—adds versatility to your garage or workshop.
See more
Specification
| Brand | GARVEE |
| Item Type Name | Transmission Jacks |
| Load Capacity | 450 Pounds |
| 450 Pounds | Red |
| Vehicle Service Type | Car |
| Material | Alloy Steel |
| Style | Hydraulic |
| Item Weight | 22.6 pounds |
See more
Description


Specifications
| Brand | GARVEE |
| Item Type Name | Transmission Jacks |
| Load Capacity | 450 Pounds |
| 450 Pounds | Red |
| Vehicle Service Type | Car |
| Material | Alloy Steel |
| Style | Hydraulic |
| Item Weight | 22.6 pounds |

Fall Upgrade SaleDealsGarvee 450 LBS Capacity Low Profile Transmission Jack with 2M Safety Straps, 7-23 in Lift Range, Heavy Duty Auto Repair Lifting Jack, Red, Compact Vehicles
4.854.85 out of 5207 Reviews
Average rating based on 207 reviews
5 star
85.0%
4 star
15.0%
3 star
0.0%
2 star
0.0%
1 star
0.0%
$12299
Key Features
- Heavy-Duty Steel Construction: Robust steel build supports up to 450 lbs—perfect for demanding repairs and maintenance.
- Versatile Lift Range: 7"–23" lift easily handles compact cars and large trucks for maximum flexibility.
- Enhanced Safety & Stability: Wide base and durable nylon safety strap keep your load secure and stable.
- Easy Maneuverability: Four swivel wheels let you position and move the jack smoothly under any vehicle.
- Multi-Functional Tool: Ideal for transmissions, exhaust work, and more—adds versatility to your garage or workshop.
Specification
| Brand | GARVEE |
| Item Type Name | Transmission Jacks |
| Load Capacity | 450 Pounds |
| 450 Pounds | Red |
| Vehicle Service Type | Car |
| Material | Alloy Steel |
| Style | Hydraulic |
| Item Weight | 22.6 pounds |
Description


Specifications
| Brand | GARVEE |
| Item Type Name | Transmission Jacks |
| Load Capacity | 450 Pounds |
| 450 Pounds | Red |
| Vehicle Service Type | Car |
| Material | Alloy Steel |
| Style | Hydraulic |
| Item Weight | 22.6 pounds |
$12299
Est. Delivery Time: Oct 26 - Oct 28In Stock
What We Offer
Accident and warranty protection by Xcotton (partner with AIG)
No import charges for all seller-shipped items and no extra charges upon delivery




















