Accident and warranty protection by Xcotton (partner with AIG)











| Brand Name | Garvee |
| Color | Beige |
| Shape | Rectangular |
| Material Type | Corduroy |
| Frame Material Type | Wood |
| Item Height | 32.68 inches |
| Seat Depth | 53.94 inches |
| Item Weight | 123.5 Pounds |
| Included Components | Cushion |
| Required Assembly | Yes |












| Brand Name | Garvee |
| Color | Beige |
| Shape | Rectangular |
| Material Type | Corduroy |
| Frame Material Type | Wood |
| Item Height | 32.68 inches |
| Seat Depth | 53.94 inches |
| Item Weight | 123.5 Pounds |
| Included Components | Cushion |
| Required Assembly | Yes |
Item temporarily unavailable
we will notify you when your item is back in stock.
Garvee Oversized Chaise Lounge Chair Indoor, 60 Inch Upholstered Sofa Bed with Throw Pillows and Armrests, Comfy Corduroy Sleeper Couch for Living Room, Bedroom, Office, Green
Garvee Convertible Corduroy Loveseat Sleeper Sofa Bed, Adjustable Backrest, Pull-Out Bed, Built-in Charging Station, Side Pockets - Perfect for Living Room, Bedroom, Apartment - Dark Gray
Garvee 4 in 1 Convertible Sleeper Sofa Bed Couch, Comfy Corduroy Folding Sofa Bed with Deep Seat & Wide Armrest, No Assembly, Boneless Floor Couch for Living Room Apartments, Black
Garvee Folding Sofa Bed, 3-in-1 Convertible Sleeper Chair with Pillow, Double Futon Couch Bed with Back Support, Double-Size Compact for Dorms & Small Spaces, Black
Garvee 4' × 328' Livestock Fence, 14-Gauge Galvanized Wire Fencing for Goats, Deer, Cattle, Farm Yards & Garden Protection
Garvee Livestock Fence, 5Ft x 328Ft Galvanized Wire Fencing, Cattle Farm Fence, Deer Fences, Heavy Zinc Goat Fences for Goat Deer Yard Livestock Protection
Garvee 28" 4-Claw Log Lifting Tongs, 5500 lb Static / 4409 lb Dynamic Steel Log Grapple with 32" Opening for Tractor, ATV, Skid Steer & Forestry
Garvee Oversized Chaise Lounge Chair Indoor, 60 Inch Upholstered Sofa Bed with Throw Pillows and Armrests, Comfy Corduroy Sleeper Couch for Living Room, Bedroom, Office, Green
Garvee Convertible Corduroy Loveseat Sleeper Sofa Bed, Adjustable Backrest, Pull-Out Bed, Built-in Charging Station, Side Pockets - Perfect for Living Room, Bedroom, Apartment - Dark Gray
Garvee 4 in 1 Convertible Sleeper Sofa Bed Couch, Comfy Corduroy Folding Sofa Bed with Deep Seat & Wide Armrest, No Assembly, Boneless Floor Couch for Living Room Apartments, Black
Garvee Folding Sofa Bed, 3-in-1 Convertible Sleeper Chair with Pillow, Double Futon Couch Bed with Back Support, Double-Size Compact for Dorms & Small Spaces, Black